Previous photo Next photo Thumbnail page
Neidrauer Adventures Photo Album » Building a Live Steam Locomotive - the Mikado Project » Section 16 - Cab Accessories
IMG_4334 IMG_4333 IMG_4332 IMG_4331 IMG_4329 IMG_4328 IMG_4327 IMG_4325 IMG_4302 IMG_4242 IMG_4239 IMG_4238 IMG_4236 IMG_4235 IMG_4231 IMG_4227 IMG_4225 IMG_4224 IMG_4223 IMG_4222
First page Previous page Index page Next page Last page
IMG_4239  [42 of 118]


Click to show/hide keyboard shortcut help
Keyboard shortcuts are active:

RIGHT arrow - next page
LEFT arrow - previous page
Page Up - index page
HOME - first page
END - last page
ESC,S,s - toggle start/stop slide show
ExhibitPlus IMG_4239
23-Apr-2012 The cab floor with location marks, ready for drilling. We next take the floor to the mill and using a stop rod in the vise so we can more accurately re-clamp, drill a small hole the size of the valve extension at each location. Re-installing the cab floor, we look down the holes at the valve stems below and check our work. Making notes if the holes need to be nudged a bit in any direction, we return the floor to the vise and drill the larger holes for the valve stem support brackets.

IMG_4334 IMG_4333 IMG_4332 IMG_4331 IMG_4329 IMG_4328 IMG_4327 IMG_4325 IMG_4302 IMG_4242 IMG_4239 IMG_4238 IMG_4236 IMG_4235 IMG_4231 IMG_4227 IMG_4225 IMG_4224 IMG_4223 IMG_4222
First page Previous page Index page Next page Last page