Previous photo Next photo Thumbnail page
Neidrauer Adventures Photo Album » Building a Live Steam Locomotive - the Mikado Project » Section 16 - Cab Accessories
IMG_4302 IMG_4242 IMG_4239 IMG_4238 IMG_4236 IMG_4235 IMG_4231 IMG_4227 IMG_4225 IMG_4224 IMG_4223 IMG_4222 IMG_4221 IMG_4220 IMG_4219 IMG_4214 IMG_4213 IMG_4212 IMG_4211 IMG_4210
First page Previous page Index page Next page Last page
IMG_4223  [50 of 118]


Click to show/hide keyboard shortcut help
Keyboard shortcuts are active:

RIGHT arrow - next page
LEFT arrow - previous page
Page Up - index page
HOME - first page
END - last page
ESC,S,s - toggle start/stop slide show
ExhibitPlus IMG_4223
20-Apr-2012 The water bypass valve mounting block has been mounted on the left cab support bracked, and a test piece of pipe flared and put on the protruding flare nipple. This pipe will be the water return connection from the engine to the tender. And I've started running the axle pump water lines under the engine, going forward.

IMG_4302 IMG_4242 IMG_4239 IMG_4238 IMG_4236 IMG_4235 IMG_4231 IMG_4227 IMG_4225 IMG_4224 IMG_4223 IMG_4222 IMG_4221 IMG_4220 IMG_4219 IMG_4214 IMG_4213 IMG_4212 IMG_4211 IMG_4210
First page Previous page Index page Next page Last page